I finished the body of my (design your own) top down sweater. This is the second ribbing I tried; it's a mock baby cable. Awwww. The first cable I tried was called "rick rack" and it just didn't sit right. I ripped it out before taking a picture, sorry. Trust me, it didn't look good. I'm going to use this ribbing on the cuffs and v-neck too.I also knit on my Corinne sweater, finished the first sleeve and began the back. I realized this weekend that I'm working on 4 sweaters at once. The good news is that 3 of the 4 are in stash yarns. The bad news is that there is no small project among them. Note to self: 1 project of the 4 must be not be a sweater.
Must go knit something.
No comments:
Post a Comment